Case Studies
Real-world examples of successful projects across solar, electrical, and energy infrastructure. See how contractors and developers are building better projects with PES Global Group.

500kW Commercial Rooftop Array
Los Angeles, California • Commercial Solar
Challenge
Large commercial facility needed to reduce energy costs and meet California's clean energy requirements. Complex rooftop with multiple roof levels and orientations required careful system design.
Solution
Designed and supplied a 500kW rooftop system using high-efficiency Canadian Solar bifacial modules with SolarEdge optimizers for maximum production. IronRidge shared rail system minimized roof penetrations while providing structural integrity.
Results
System commissioned on schedule and within budget. 650,000+ kWh annual production, $85,000+ annual utility savings, 15-year payback with incentives.
Commercial Solar Contractor, California
Project Details
- System Size
- 500kW DC
- Products
- Canadian Solar panels, SolarEdge inverters, IronRidge racking
- Sector
- Commercial Solar

2MW Community Solar Farm
Houston, Texas • Utility-Scale Solar
Challenge
Developer needed reliable supply of utility-grade equipment for community solar project with aggressive timeline. Required full technical support for utility interconnection requirements.
Solution
Coordinated delivery of 5,000+ high-wattage JA Solar modules directly from manufacturer. Provided SMA central inverters and GameChange Solar Genius Tracker system. Technical team assisted with utility interconnection documentation.
Results
All equipment delivered on schedule. System online in 6 months from order to energization. Now serving 300+ community subscribers.
Utility-Scale Developer, Texas
Project Details
- System Size
- 2MW DC
- Products
- JA Solar modules, SMA central inverters, GameChange racking
- Sector
- Utility-Scale Solar

Industrial Facility Electrical Upgrade
Monterrey, Mexico • Industrial Electrical
Challenge
Manufacturing facility expansion required major electrical infrastructure upgrade. Cross-border logistics to Mexico with customs clearance and coordinated delivery to active jobsite.
Solution
Sourced complete electrical package including main switchgear, distribution panels, wire and cable, and motor control centers. Portlandia Logistics managed cross-border freight through Laredo with full customs documentation.
Results
All equipment cleared customs without delays. Coordinated deliveries matched construction schedule. Facility online 2 weeks ahead of schedule.
Industrial Electrical Contractor, Arizona
Project Details
- System Size
- 2,500A Service
- Products
- Eaton switchgear, Southwire wire and cable, ABB motor controls
- Sector
- Industrial Electrical

Residential Solar + Storage Deployment
San Juan, Puerto Rico • Residential Solar + Storage
Challenge
Post-hurricane residential solar + storage program for 120 homes. Required ocean freight coordination to Puerto Rico and local delivery across the island.
Solution
Supplied complete solar + storage packages for 120 residential installations. LONGi high-efficiency panels paired with Enphase IQ8 microinverters and IQ Battery systems. Ocean freight to San Juan with local distribution.
Results
All 120 homes completed within 8-month timeline. Systems providing backup power during grid outages. Average 85% offset of utility consumption.
Residential Solar Installer, Puerto Rico
Project Details
- System Size
- 120 homes, 6kW-10kW each
- Products
- LONGi Solar panels, Enphase microinverters and batteries
- Sector
- Residential Solar + Storage

Multi-Location EV Charging Network
Toronto, Ontario • EV Charging Infrastructure
Challenge
Corporate fleet electrification required EV charging infrastructure at 25 locations across Ontario. Needed coordinated equipment supply and technical support for electrical contractors at each site.
Solution
Supplied ChargePoint Level 2 charging stations with all electrical equipment for 25 locations. Coordinated deliveries to match construction schedules. Technical support for load calculations and utility coordination.
Results
All 25 locations operational within 6 months. 100 charging ports serving corporate EV fleet. Contractor team completed installations efficiently with full technical support.
Commercial Electrical Contractor, Ontario
Project Details
- System Size
- 25 locations, 100 charging ports
- Products
- ChargePoint stations, Eaton electrical equipment, Southwire wire
- Sector
- EV Charging Infrastructure

Agricultural Solar Operations
Nebraska • Agricultural Solar
Challenge
Large-scale agricultural operation needed to reduce electricity costs for irrigation pumps and facility operations. Rural location required coordination of freight to remote site.
Solution
Designed 750kW ground-mount system using Trina Vertex high-wattage modules with SMA Sunny Central inverters. Terrasmart ground mount system suitable for agricultural applications. Coordinated freight delivery to rural Nebraska location.
Results
System offset 90% of irrigation and facility electricity. $120,000+ annual savings. Simple 12-year payback with USDA REAP grant.
Agricultural Solar Installer, Nebraska
Project Details
- System Size
- 750kW Ground Mount
- Products
- Trina Solar modules, SMA inverters, Terrasmart ground mount
- Sector
- Agricultural Solar